Australian Clinical Labs - Corio Village

We were engaged to deliver the fit-out of a new clinical laboratory within Corio Village, creating a functional and efficient space tailored to the specific needs of a medical environment. 

The project required careful planning and seamless integration of infrastructure within an existing building footprint. Every element—from plumbing to air conditioning—was installed to the highest standards, ensuring compliance with all relevant industry regulations.

Client:
Fontic Group Pty Ltd
Contract Value:
$250,000
Commenced:
August 2023
Completed:
September 2023

Consultation
& Design

The fit-out aimed to transform a new retail space into a fully operational clinical laboratory. We worked closely with Fontic Group Pty Ltd to develop a layout that not only optimised the available space but also adhered to regulatory requirements. 

A key challenge was the integration of new services into the existing structure. This required precise coordination to ensure plumbing, electrical, and mechanical systems were efficiently connected without causing disruption to the overall building functionality.

Join us

Material Selection

Given the high-traffic and hygienic demands of a clinical environment, the selection of durable and functional materials was essential. The scope of work included:

icon
Plumbing Layout Adjustments
icon
New Flooring Installation
icon
Partition Walls & Ceilings
icon
Air Conditioning System
icon
Electrical & Data Integration
icon
icon
icon
Join us

Execution

With designs finalised and specifications approved, our team moved forward with precision to complete the fit-out within the agreed timeline, minimising any disruptions to the surrounding environment:

icon
Plumbing Works
icon
Flooring Installation
icon
Partition & Ceiling Installations
icon
Air Conditioning & Ventilation
icon
Final Fit-Out & Testing
icon
icon
icon
Join us

Completion & Handover

Upon completion, the Corio Village Clinical Lab was handed over as a fully equipped, professional-grade medical facility. The layout, materials, and installations were all designed with both functionality and longevity in mind, meeting the client’s requirements for a top-tier clinical space. 

The result is a workspace that ensures the smooth operation of the essential medical functions within the lab.

Join us